Calendar Template extension adds to SugarCRM Module Builder a new template to create custom modules that combines the functionalities of SugarCRM Calendar Module and the customization capabilities of Module Builder.

Additionally, a wide range of Time Aggregate Measures, calculated from the module's field values, can be displayed in the views of Custom Calendar Modules.


Contents

Create a Custom Calendar Module

Calendar Template allows to create modules having the same look of the SugarCRM Calendar module, but may be customized at will.


Administrator can now create a Custom Calendar Module (CCM) with any fields, included AdvancedDatetime and Code fields that allow calculation on the time dimensions and measures used by the module itself.

Day view sample cut.png

Figure 1


Cal1 gen min lens.jpg

Figure 2


Custom Module, once deployed, is available both in the Classic SugarCRM Mode and in the Calendar Mode, which lets the user create/view/edit/delete the elements from the common calendar views:


Also, the Aggregate Measure functionality is provided.


Through aggregates, Administrator can define special Code fields in CCM that can be executed and viewed on each specific Calendar view.

Each view has a main class of Total Aggregate Measures that is shown at its bottom (Figure 4). The same figure shows how the Week, Month and Year views support special sub-aggregates.

The complete set of Aggregates and Sub-Aggregates available for each view can be found in the following table.


Aggregate
View
 Day 
Week
Month
Year
Day
-
Week
-
-
Month
-
-
Year
-
-
-

Table 1


How to create a Custom Calendar Module

Calendar Template is simply another Module Template choice appearing at the Template selection during the Module Creation process.

Thus, to create a new CCM, the Calendar Template must be selected as shown in the Figure 3. The new module has all the fields of a basic SugarCRM module, and in addition the “date_start” default field (an AdvancedDatetime field of Date/ Time sub-type labelled “Date Time”) which is the key-dimension used to place the element in any Calendar view and to aggregate it properly.

From now on, the module is managed exactly like the other SugarCRM modules: fields can be created / modified / deleted.

AdvancedDatetime and Code fields are particularly useful to CCMs, as is shown later and in the Samples Simple Invoice Calendar Module and Work Timesheet Calendar Module.

Calendar template.png

Figure 3


The only relevant difference from a SugarCRM Module is that the Fields added in the ListView are also shown in the Element’s cell of the Calendar View.


After that all the customizations are performed, the CCM can be Deployed, Published and Exported like any other SugarCRM module and it is ready to be used.


Sub aggregates.jpg

Figure 4


Year view sample.png

Figure 5


Usage of a Custom Calendar Module

Custom Calendar Modules (CCM) bring together the key points of default SugarCRM Modules and the SugarCRM Calendar Module.


Calendar Views of CCM, shown in Figure 1, Figure 2, Figure 4 and Figure 5, are described in detail below.



Creation of Aggregates and Sub-Aggregates

Aggregates and Sub-Aggregates are Code fields whose name follows a particular syntax.

Administrator can add these fields to the CCM through Module Builder and, after having deployed the Module, Aggregates are placed in the Views exactly at the level specified in the field name. In the calendar View, the label of the Code field appears followed by the Aggregate Value, which is the result value calculated in the PHP Code execution. Of Course being it a Code field it can also be used for advanced customizations: for example to append Buttons, Images and other elements to the bottom of the Module.

The same Code Aggregate field can also be used in more than one Calendar View.


WARNING : Aggregate and Sub-Aggregates Code fields do not need to be added to any Layout to be viewed.


Name Syntax for Aggregates and Sub-Aggregates

To create an Aggregate for a specific Calendar View, the name of the field must simply contain the adverb of time related to that View, in English language, separated from the rest of the string by an underscore (_).

For example a ‘total’ field that should appear at the bottom of month views could be named

total_monthly

One field can also be viewed in multiple calendar views. To achieve this, the adverbs of time related to all the views must be inserted in the field name, using the underscore as separator. For example an “income” field can be required in the Week, Month and Year view: the name of the filed would be

income_weekly_monthly_yearly

The syntax for the Sub-Aggregates is similar: before the adverb of the main aggregate, telling the application which view the field must appear in, an additional word selected among “day”, “week” or “month” must be placed without the underscore separator. This word specifies which sub-dimension the Sub-Aggregate have to be placed in.


The syntax of an Aggregate field’s name has the following definition:

chunk_0[chunk_1[chunk_2 ... [chunk_n]]]

where

chunk_i = <Name of the field> 

| /* OR */

[day|week|month](daily|weekly|monthly|yearly) 


For example, if the Administrator wants to create a Code field named “amount” which has to be viewed as Aggregate in the Day view and as a Day Sub-Aggregate in the Week and Month views, the name to be assigned in Module Builder is

amount_daily_dayweekly_daymonthly


PHP Code Content for Aggregates and Sub-Aggregates

Working Examples on how to manage Aggregates and Sub-Aggregates can be found in Samples / Scenarios Section.


To calculate the Aggregates and Sub-Aggregates values, two methods can be followed.


Calculate the value using $bean variable

The $bean variable is available from inside the Code fields in CCM, same as for the default ones.

In the examples hereafter we assume that the aggregation function is the SUM.


As for the dayweekly and daymonthly Sub-Aggregates, all the values of the day are available in the sugar_bean field of the objects collection of the $bean array.

For example a “dayweek” Sub-Aggregate of a field named “total” can be evaled with a Code like the following:

foreach($bean as $a) {
    $sum += $a->sugar_bean->total;
}

Others Aggregates and Sub-Aggregates have more levels of values to be summed, stored in the field acts_arr.

For example to calculate the total in the monthly Aggregate of the previous example, the Code is:

foreach($bean as $v) {
    if (isset($v->acts_arr)) {
        foreach ($v->acts_arr as $b) {
            foreach ($b as $a) {
                $total += $a->sugar_bean->total;
            }
        }
    }
}


Sum the values calculated in other Fields/Sub-Aggregates

The method described in the previous paragraph permits to calculate the Aggregates and Sub-Aggregates each time it’s needed without collecting the partial results.

To save calculation time the partial Sub-Aggregates results might be saved in GLOBALS variables, and then summed in higher-level Aggregates.


Carrying on with the “total” example, if the day and week Sub-Aggregates are required in the Month view, the following procedure may be followed.


1. Create a partial1_daymonthly Sub-Aggregate as described in the previous paragraph, for the total amount of each day of the month.

The final value has to be both echoed and stored in GLOBALS variable:

global $tot_week, $tot;
$sum = 0;
foreach($bean as $a) {
    $sum += $a->sugar_bean->total;
}
if (!isset($tot_week)) $tot_week = 0;
$tot_week += $sum;
$tot += $sum;
echo $sum


2. Create a partial2_weekmonthly Sub-Aggregate that simply echoes the partial value calculated and reset it:

global $tot_week;
echo $tot_week;
$tot_week = 0;


WARNING : The procedure explained in this paragraph has a key-point: it needs that all the fields are evaled in the exact order explained to work properly. Generally speaking, the eval order must be the following:

1. first, the Low-level Sub-Aggregates

2. then, the High-level Aggregates

3. finally, the Total Aggregate

To have the expected execution order followed, the Sub-Aggregates and Aggregates fields must be created in the exact order they have to be calculated.



Samples / Scenarios

Simple Invoice Calendar Module

Scenario: build a simple Module that allows to store simple Invoice (with only a number and an amount) with Day / Week / Month Aggregates and Sub-Aggregates.


Procedure:

Step 1

Create a new package and a new CCM in module Builder as Explained in the paragraph How to create a Custom Calendar Module

Step 2

Add the following fields in this exact order (Logic Hook is assumed to be Default):

Field #1

Data Type: TextField

Field Name: invoice_id

Field #2

Data Type: Currency

Field Name: total

Field #3

Data Type: Code

Field Name: tot_daymonthly_dayweekly

DB Type: Non-DB

Code:

global $amount_week, $fle_tot;
if (isset($bean->date_start)) return;
$sum = 0;
foreach($bean as $a) {
    $sum += $a->sugar_bean->total;
}
if (!isset($amount_week)) $amount_week = 0;
$amount_week += $sum;
$fle_tot += $sum;
echo currency_format_number($sum)


Field #4

Data Type: Code

Field Name: tot_weekmonthly

DB Type: Non-DB

Code:

global $amount_week;
echo currency_format_number($amount_week);
$amount_week = 0;


Field #5

Data Type: Code

Field Name: tot_monthly

DB Type: Non-DB

Code:

foreach($bean as $v) {
    if (isset($v->acts_arr)) {
        foreach ($v->acts_arr as $b) {
            foreach ($b as $a) {
                $total += $a->sugar_bean->total;
            }
        }
    }
}


Step 3

Add the fields invoice_id and total to the following Layouts:


Step 4

Deploy the package.

The result is an Invoice Module with partial and total amounts.

A Week view can be seen in Figure 6 and a Month view in Figure 4.


Inv week view.jpg

Figure 6


Work Timesheet Calendar Module

Module Deployment

Scenario: build a Basic Timesheet Management Module for the Employees of a Company. The module automatically calculates and shows the Worked Time Amount for each Employee or group of them, grouped for Day, Week and Month.


Procedure:

Step 1

Create a new package and a new CCM in module Builder as explained in the paragraph How to create a Custom Calendar Module


Step 2

Add the following fields in this exact order (Logic Hook is assumed to be Default for all):


Field #1

Data Type: DropDown

Field Name: direction

Drop Down List:

Field #2

Data Type: Code

Field Name: amount_daily

DB Type: Non-DB

Code:

require_once('custom/include/AdvancedDatetime/AdvancedDatetime.php');
$dtcm = new AdvancedDatetimeOperations($bean);
$sum = '00:00';
foreach($bean as $v) {
    if (isset($v->acts_arr)) {
        foreach ($v->acts_arr as $a) {
            if ($a[0]->sugar_bean->direction == 'entry') {
                $entry = $a[0]->sugar_bean->date_start;
            }
            elseif ($a[0]->sugar_bean->direction == 'exit') {
                if ($entry) {
                    $sum = $dtcm->addDate($dtcm->subDate($a[0]->sugar_bean->date_start, $entry), $sum);
                }
            $entry = '';
            }
        }
    }
}
echo $dtcm->getValue($sum);
Field #3

Data Type: Code

Field Name: amount_weekly_monthly

DB Type: Non-DB

Code:

global $dtcm, $time_amount;
require_once('custom/include/AdvancedDatetime/AdvancedDatetime.php');
$dtcm = new AdvancedDatetimeOperations($bean);
$time_amount = '00:00';
foreach($bean as $v) {
    if (isset($v->acts_arr)) {
        foreach ($v->acts_arr as $b) {
            foreach ($b as $a) {
                if ($a->sugar_bean->direction == 'entry') {
                    $entry = $a->sugar_bean->date_start;
                }
                elseif ($a->sugar_bean->direction == 'exit'){
                    if ($entry) {
                        $time_amount = $dtcm->addDate($dtcm->subDate($a->sugar_bean->date_start, $entry), $time_amount);
                    }
                    $entry = '';
                }
            }
        }
    }
}
echo $dtcm->getValue($time_amount);
Field #4

Data Type: Code

Field Name: amount_daymonthly_dayweekly

DB Type: Non-DB

Code:

global $dtcm, $amount_week;
if (isset($bean->date_start)) return;
$sum = '00:00';
foreach($bean as $a) {
    if ($a->sugar_bean->direction == 'entry') {
        $entry = $a->sugar_bean->date_start;
    }
    elseif ($a->sugar_bean->direction == 'exit') {
        if ($entry) {
            $sum = $dtcm->addDate($dtcm->subDate($a->sugar_bean->date_start, $entry), $sum);
        }
        $entry = '';
    }
}
if (!isset($amount_week)) $amount_week = '00:00';
$amount_week = $dtcm->addDate($sum, $amount_week);
echo $dtcm->getValue($sum)
Field #5

Data Type: Code

Field Name: amount_weekmonthly

DB Type: Non-DB

Code:

global $dtcm, $amount_week;
if (isset($bean->date_start)) return;
if (!isset($amount_week))
    echo '00:00';
else
    echo $dtcm->getValue($amount_week);
$dtcm->setValue($amount_week, '00:00');


Step 3

Add the fields “direction” and “assigned_user_id” (“Assigned to” or “User”) to the Layouts:

Optionally add the date_start field (“Date Time”) to the ListView Layout to view the exact Time entry/exit in the sheet.


Step 4

Deploy the package.


Module Usage

The Timesheet Module that has been deployed provides the basic functionalities of a Work Timesheet management:


Timesheet elements

An element of the Work Timesheet module is an Entry or Exit of a SugarCRM user. For example if Sarah has started to work at 9:00AM of 05/18/2009 and stopped at 12:00PM, then from 2:02PM to 6:57PM, four elements must be created in the Timesheet module (one for each entry/exit)

Timesheet week 2.jpg

Figure 7


Partial Worked Time Amounts

The Worked Time Amount is available as Aggregate and Sub-Aggregate in the Day, Week and Month views.

The Week view of the Timesheet Module would be something like what shown in Figure 7. In the figure both the Daily Sub-Aggregates and the Weekly Aggregate are correctly reported.

The Month view, reporting the Daily and Weekly Sub-Aggregates and Monthly Aggregate, can be seen in Figure 8.


Timesheet month.jpg

Figure 8


Total Worked Time Amount

The Worked Time Amount can be calculated for a single Employee only, for a group of them or for all of them (total Worked Time Amount). To achieve it, the Basic/Advanced Search “Assigned to” filter can be used.